Interested in our services?

REQUEST A QUOTE

or call 020 8546 7211

Building Regulation Approval

Whilst sometimes referred to as Building Control and commonly considered yet another hurdle to jump over before your project can begin it is important as this stage serves to ensure your safety.

By far the most technical aspect of any project is the Building Regulation approval stage. This requires intricate and precise drawings that will detail exactly how the building will be constructed. At times it will also require the input of other industry professionals such as a structural engineer.

In short, this stage requires us to prove that the proposed works comply with the most recent edition of the Building Regulations. On the surface it looks to be a very confusing and detailed package of drawings. In reality it is detailed but it need not be confusing. Our team of Architectural Technicians will be able to produce a professional package of drawings that demonstrate compliance.

Provided we have a strong idea that the design scheme will be granted permission we can look to proceed with this stage of work at the same time as the previous stage. This allows us to ensure that the project is completed in the most time efficient manner.

Again, there is a decision to be made as to how compliance is gained, an application can be made through the local authority or an approved corporate inspector can be instructed. There are benefits to both options which is further explored in our Building Control blog post.

Once drawings have been sourced from other industry professionals, a package of drawings is collated that is consistent with one another whilst also bringing through any specification outlined in the planning stage such as in respect of building materials and finishing.  This package can then be submitted and also provided to a builder to analyse and provide a costing but a site visit may also be necessary.

It is worth bearing mind that this stage is an evolutionary one, amendments to the drawings are common following comments from the Building Control Officer, again, and as always our team will act as your agent in all correspondence so that it dealt with efficiently. Any updated drawings will be sent to you so that you can update your builder.

Full Building Regulation approval will not be gained until the project has been completed as the Building Control Officer will want to conduct site visits during certain parts of the build to ensure compliance. Once the project is finished you will be issued with a certificate to demonstrate compliance.
Whether you need one construction detail or a full package of drawings, whether it is simple loft conversion or a double storey rear extension, our CIAT accredited Architectural Technicians will work with you to ensure that we deliver exactly what you need for your project.

If you are interested in our design & planning service or any of our other architectural service, please do not hesitate to contact a member of the team.

RELATED BLOG POSTS

A guide to the residential lease extension process

Leaseholders have the right to extend their leases under the Leasehold Reform, Housing and Urban Development Act 1993.  Under the legislation the owner of a leasehold flat has the right to request a new lease which is 90 years longer than their current lease and at a peppercorn ground rent throughout. In order to qualify ... Read More >>

Can my neighbour build on my land?

In general, your neighbour only has the right to build up to the boundary line (line of junction) between the two properties but there are circumstances when they can legitimately build on your land. Ground Floor Extension You can give consent for them to build a new party wall and foundations on your land. An existing ... Read More >>

CONTROLLING CONDENSATION AND MOULD

What is Condensation? There is always some moisture in the air, even if you cannot see it. If air gets cold, it cannot hold all the moisture produced by every-day activities and some of this moisture appears as tiny droplets of water, most noticeable on windows on a cold morning. This is condensation. It can also be seen in ... Read More >>

read more posts